Nitin Gadkari inaugurates and lays foundation stone of over 765 kms long 14 NH projects worth over Rs 13,000 crore in Telangana

  • Nitin Gadkari inaugurates and lays foundation stone of over 765 kms long 14 NH projects worth over Rs 13,000 crore in Telangana; Says, all the districts in the State to be connected with National Highways soon

  • 59 road works with approved length of 1918 kms costing Rs 17,617 crore sanctioned in Telangana during the last 6 years

  • Rs 2,436 crore sanctioned under CRIF till now for the State, Rs 1483 crore already released

Union Minister for Road Transport and Highways Nitin Gadkari inaugurated and laid the foundation of 14 NH projects in Telangana today thru virtual mode. These projects include 765.663 kms long roads worth Rs 13,169 crore. The event was attended by Union Ministers G Kishan Reddy and Gen Dr. V K Singh, Telangana Minister for Roads & Buildings, Legislative Affairs and Housing Vemula Prashanth Reddy, Speaker of Telangana Assembly Pocharam Srinivas Reddy, MPS and MLAs, in addition to senior officers from the Centre and the State.

A video grab of the virtual function for inauguration and foundation stone laying of 14 NH projects in Telangana on 21.12.2020

Speaking on the occasion, Gadkari informed that a total of 59 road works with an approved length of 1918 kms and a cost of Rs 17,617 crore have been sanctioned in Telangana in the last 6 years. Of this, 1,782 km length has already been sanctioned with a cost of 15,689 crore. He said, almost all of the 33 districts in the State today have connectivity with National Highways.

The remaining district Peddapally will also be connected to the network soon. The Minister said, there has been a phenomenal growth of 55.71 percent NH length in the last 6 years in the State. Nearly 1400 km NH length has been added during this period in the State, he said. Under CRIF scheme, a sum of Rs 2,436 crore has been sanctioned till now for the State, of which Rs 1483 crore has already been released.

Gadkari informed that while construction of 841 km roads worth Rs 4793 crore has been completed since 2014-15 in Telangana, work is going on for construction of another 809 kms at a cost of Rs 13,012 crore. He added that during the current financial year, 13 major projects costing Rs. 8,957 Cr of length 328 km are proposed to be awarded in the State. Three major projects for 192 kms worth Rs 2339 crore are under bidding, he said. Another 21 NH works with a total length of 1422 km and a total cost of Rs 27,116 crore are under various stages of DPR preparation.  These works are likely to be completed by FY 2024-25.

The Minister said that in line with the Prime Minister’s vision for a New India, the development of world-class transport infrastructure has been prioritized, through initiatives such as the Bharatmala Pariyojana, India’s largest-ever infrastructure development program. The Pariyojana was conceptualized through a scientific study of freight traffic movement between key origin-destination pairs to enable efficient freight and passenger movement. Projects with length 1,730 kms have been identified for development under Bharatmala Pariyojana in the state of Telangana. Out of these 14 projects, 9 projects with length 423 km have already been awarded at a cost of Rs 7,400 crore.


Union Minister of State for Road Transport and Highways Gen Dr. V K Singh addressing the virtual function for inauguration and foundation stone laying of 14 NH projects in Telangana on 21.12.2020

Development of greenfield and access-controlled corridor has also been planned in Telangana to ease-out traffic on existing corridors, reduce travel time and costs, and also provide a boost to the economy. These include:

  • Surat Ahmadnagar, Solapur, Kurnool, Chennai (75 km length in Telangana)
  • Suryapet - Khammam - Devarapalle (164 km length in Telangana)
  • Indore - Hyderabad (136 km length in Telangana)

While the development of these corridors will ease the traffic on existing routes, it will also lead to improved savings, due to reduced travel time and fuel consumption thereby also reducing the carbon footprint. Development of multiple wayside amenities is also being planned across the corridors to improve rider comfort. The corridors have been planned as fully access-controlled leading to enhanced rider mobility and safety. Development of these corridors would also generate both white-collar and blue-collar jobs thereby also providing the much-needed boost to the economy.

Gadkari called upon the State to take up diversification of agriculture into economic productivity. He said, the country is already over-producing sugar and rice, and sufficient stock are available with the government. The surplus may be converted to Ethanol, which can be used as an alternative fuel for vehicles. He said this will not only improve farmers' income but will also be an indigenous source of fuels for the country.


Telangana Minister for Roads & Buildings, Legislative Affairs, and Housing Vemula Prashanth Reddy addressing the virtual function for inauguration and foundation stone laying of 14 NH projects in Telangana on 21.12.2020

 

List of Projects for Dedication to Nation and E-Foundation Stone laying: 

Sl.

No.

Name of Project

Length in

km

Cost in Rs.

crore

 

Dedication to Nation NH Project

1.

Four Laning of Yadgiri - Warangal Section of NH-163 (Old No.202) from Km 54/000 to Km.150/000 under NHDP Phase-IV to be executed under EPC mode in the State of

Telangana.

99

1890

2.

Rehabilitation and Up-gradation to Two lane with Paved Shoulders from Km 0/0 to 72/6 of NH-365 (Nakrekal to Thanamcherla section) in the State of Telangana under

NHDP-IV on EPC basis in Suryapet and Nalgonda district

66.56

605.08

3.

Rehabilitation and upgradation of Hyderabad outer ring road to Medak Section of NH-765D from existing km.15.970 (Design km.0.0) to existing km.78.70 (Design km.62.92) to two lane with paved shoulder/four lane on EPC Mode in the

State of Telangana (Job No.NH-765D-TS-2017-18- 45) in Medak and Malkajgiri district

62.92

426.52

4.

Widening to two lane with paved shoulders from Km 59.500 to Km 132.033 of Manneguda-Ravulapally section of NH- 163 on EPC mode in the State of Telangana (Job No.NH-

163-TS-2017- 034)- District Vikarabad and Narayanpet

72.53

359.27

5.

Widening & Strengthening of existing 2-lane to 2-lane with paved shoulders from Km.159/0 to 165/4 & 186/0 215/0 Atmakur to Pasra section of NH-163 on EPC mode in the

State of Telangana (Job No.NH-163-TS-2017-18- 41).

34.690

230.03

6.

Widening & Strengthening of the existing carriageway in 2 lane with paved shoulders from Km.25/0 Km.59/2 (Design Ch. Km.25.467 to 59.200) Mahadevpur to Bhupalpally section

of NH-353C on EPC mode in the State of Telangana (Job No.NH-353C-TS-2017-18- 42).

33.733

206.13

 

E-Foundation NH Projects

7.

Four laning of the Suryapet (Design Ch 0.420/Existing Km

128.500 of NH-65) to Khammam (Design Ch 59.046/Existing Km 50.750 of old SH42) of NH-365BB (Old SH-42) (Design Length –  58.626  Km)  in  the  state  of  Telangana under

Bharatmala Pariyojana on Hybrid Annuity Mode

 

58.63

 

2054.29

8.

Four laning of NH-363 from Mancherial (Design Km. 00.000/Existing Km. 251.900) to Repallewada (Design Km. 42.000/Existing Km. 288.510 (Design Length 42.00 Km) in

the State of Telangana on Hybrid Annuity Mode

 

42.00

 

1556.12

9.

Four laning of NH-161 from Ramsanpalle Village (Design Km 39.980 / Existing Km.44.757) to Mangloor Village (Design Km 86.788 / Existing Km 91.350) (Design Length = 46.808 Km) in the State of Telangana on Hybrid Annuity Mode -

Package-II

 

46.81

 

1551.27

Sl.
No.
Name of ProjectLength in
km
Cost in Rs.
crore
10.Four laning of NH-161 from Kandi (Design Km 0.000) (Km
498.250 of NH-65) to Ramsanpalle (Design Km 39.980 / Existing Km 44.757) (Design Length = 39.980 Km) in the State of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode- Package – I
 
39.98
 
1304.58
11.Four laning of the stretch from Mangloor (Design Km86.788
/ Existing Km 91.350) to Telangana/Maharashtra Border (Design Km 135.751 / Existing Km 140.500) (Design Length
= 48.963 Km) in the State of Telangana on Hybrid Annuity Mode - Package – III
 
48.96
 
1247.52
12.Four laning of NH-363 from Repallewada (Design Km.42.000
/ ExistingKm.288.510) to Telangana / Maharashtra Border (Design Km.94.602 / ExistingKm.342.000) (Design Length = 52.602 Km) in the state of Telangana under NH(O) on Hybrid Annuity Mode
 
52.60
 
1226.85
13.Balance Works of Rehabilitation and Upgradation of
Nakrekal to Nagarjunasagar section of NH-565 to 2L+PS/4L from Km 1.000 to Km 86.057 under NH(O) for the year 2020- 21 in Nalgonda district in the State of Telangana
85.45369.91
14.Widening and Strengthening of existing intermediate
lane/two lane to two lane with paved shoulders from km 678+555 to km 699+655 of Nirmal to Khanapur section of NH 61 Extended in the state of Telangana under NH(O) on EPC mod (61-TS-2019-20-56) in Nirmal District
21.80141.80
 Total765.66313169.37

More Press News